Matarbari remains assignment-led. Project or channel information does not establish routine crew-change access. CPA reports against the named facility, confirmed local interface and current authority position for the actual vessel movement.
The movement update covers airport reception, hotel or holding position, facility access, boarding or sign-off, immigration completion and final departure. A missed flight, refused access, document defect or vessel-window change is reported with the next workable action and cost effect.
Completion Reporting
On-signers and off-signers may require different road, facility and vessel-transfer arrangements. Vehicle approval, luggage, medical condition, service-boat timing and the Master’s safe-transfer decision remain specific to each group and movement window.
Joining crew require travel readiness, entry formalities, local reception and a boarding plan connected to the actual vessel position. Off-signers require disembarkation acceptance, outward formalities, onward travel and sufficient margin between vessel transfer and flight departure.
Build Separate Joining and Sign-Off Tracks
The go or no-go update states what is accepted, what remains pending, the last safe booking time and the effect of a schedule change. Where the vessel window is narrow, the fallback flight, hotel or holding position remains under principal review.
Non-refundable travel is not committed until the facility, vessel position, access contact, immigration route and transfer method are accepted for the named assignment. Future port design or general project information is not used as movement approval.
Set a Go or No-Go Point Before Ticketing
Set the go or no-go point before any ticket is bought. It is reached only when the facility or operator has accepted the nomination, the vessel position and ETA/ETD are confirmed, the crew documents are in order and a safe transfer method is agreed for the named movement.
Until then, travel is not committed. Statutory clearance stays with immigration and other authorities, access with the facility or operator, and vessel-side movement with the Master or OOW. CPA coordinates the accepted sequence and reports exceptions; it does not guarantee approval or transfer timing.